> ## Documentation Index
> Fetch the complete documentation index at: https://docs.kimp360.com/llms.txt
> Use this file to discover all available pages before exploring further.

# How Syncing Works

Once a board is connected, each card gets its own linked Wrike task the first time something
syncable happens to it. A title or status change stays in sync in both directions: change it on
either side and the other updates to match. Everything else described below flows from KIMP360
to Wrike.

## From KIMP360 to Wrike

**1. A new request creates a Wrike task**

A new card on a connected board creates a matching task in Wrike, with the same title and
description, in whatever status the card was created into.

**2. Changing a card's status updates the task's status**

If an admin has mapped that status for this board (see Status Mapping below), the task moves
to the exact Wrike status mapped to it. Without a mapping, only Completed, Archived and
Unarchived still sync, to Wrike's generic Completed, Cancelled and Active statuses.

**3. Renaming a card renames the Wrike task**

Editing a card's title updates the linked Wrike task's title to match.

**4. Editing a card's request details updates the task's description**

The Wrike task's description is rebuilt from the card's own description plus a readable
summary of its other request details, whenever any of them change: request type, product
type, requested sizes, text content, file format, software, brand, and any additional or
reference files or text copy files, each as a direct link back to the file.

## From Wrike to KIMP360

**1. Renaming a task renames the card**

Editing a linked Wrike task's title updates the KIMP360 card's title to match, as long as the
board's owner still has an active role on the board with associated permission.

**2. Moving a task updates the card's status**

Moving the task between Drafts, Requested and Completed moves the card to match, in either direction.

## Status Mapping

An admin can map each of KIMP360's statuses (Drafted, Requested, In Progress, In Review,
Completed) to a specific custom status in the connected Wrike account, from
**My Account > Settings > Wrike Integration**. This is what lets all five statuses sync in both
directions, not just Completed: without a mapping configured for a particular status, that status
change doesn't cross between KIMP360 and Wrike (except Completed, Archived and Unarchived, which
always sync to Wrike's generic groups regardless).

## What doesn't sync

**1. Creating a task directly in Wrike**

Doesn't create a card in KIMP360. A link between a card and a task only ever starts from the
KIMP360 side.

**2. A task's description, edited in Wrike**

Description changes only flow from KIMP360 to Wrike, not back.

**3. Deleting a card in KIMP360**

Doesn't delete or cancel the linked Wrike task.

**4. Comments, due dates and assignees**

None of these sync, in either direction.

**5. A few request-detail fields, when changed entirely on their own**

Product type, the reference note, tags, and uploading a file only reach Wrike's description
when paired with a change to a field that is already tracked (title, description, dimensions,
text content, file format, software, brand). Changed entirely by themselves, they don't trigger
an update, though they still show up correctly whenever paired with one of those, or when the
card is first created.

More of this list syncs in a future update.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.