Skip to main content
Once a board is connected, each card gets its own linked Wrike task the first time something syncable happens to it. A title or status change stays in sync in both directions: change it on either side and the other updates to match. Everything else described below flows from KIMP360 to Wrike.

From KIMP360 to Wrike

1

A new request creates a Wrike task

A new card on a connected board creates a matching task in Wrike, with the same title and description, in whatever status the card was created into.
2

Changing a card's status updates the task's status

If an admin has mapped that status for this board (see Status Mapping below), the task moves to the exact Wrike status mapped to it. Without a mapping, only Completed, Archived and Unarchived still sync, to Wrike’s generic Completed, Cancelled and Active statuses.
3

Renaming a card renames the Wrike task

Editing a card’s title updates the linked Wrike task’s title to match.
4

Editing a card's request details updates the task's description

The Wrike task’s description is rebuilt from the card’s own description plus a readable summary of its other request details, whenever any of them change: request type, product type, requested sizes, text content, file format, software, brand, and any additional or reference files or text copy files, each as a direct link back to the file.

From Wrike to KIMP360

1

Renaming a task renames the card

Editing a linked Wrike task’s title updates the KIMP360 card’s title to match, as long as the board’s owner still has an active role on the board with associated permission.
2

Moving a task updates the card's status

Moving the task between Drafts, Requested and Completed moves the card to match, in either direction.

Status Mapping

An admin can map each of KIMP360’s statuses (Drafted, Requested, In Progress, In Review, Completed) to a specific custom status in the connected Wrike account, from My Account > Settings > Wrike Integration. This is what lets all five statuses sync in both directions, not just Completed: without a mapping configured for a particular status, that status change doesn’t cross between KIMP360 and Wrike (except Completed, Archived and Unarchived, which always sync to Wrike’s generic groups regardless).

What doesn’t sync

1

Creating a task directly in Wrike

Doesn’t create a card in KIMP360. A link between a card and a task only ever starts from the KIMP360 side.
2

A task's description, edited in Wrike

Description changes only flow from KIMP360 to Wrike, not back.
3

Deleting a card in KIMP360

Doesn’t delete or cancel the linked Wrike task.
4

Comments, due dates and assignees

None of these sync, in either direction.
5

A few request-detail fields, when changed entirely on their own

Product type, the reference note, tags, and uploading a file only reach Wrike’s description when paired with a change to a field that is already tracked (title, description, dimensions, text content, file format, software, brand). Changed entirely by themselves, they don’t trigger an update, though they still show up correctly whenever paired with one of those, or when the card is first created.
More of this list syncs in a future update.